Cost overruns, project delays, and negative legal issues overshadow all too many construction projects on the water and on land. Generally neither the client nor the contractor ever gains from such experiences. Being in agreement on all financial and construction issues prior to commencement of any project is vitally important in ensuring a smooth and timely process. Big Barge Dock Systems believes in entering into a construction agreement that clarifies all project objectives and expectations on behalf of both Big Barge Dock Systems Inc. and the client to equally protect investments. Once the Agreement is entered into, the following occurs:

  • Materials are ordered and the steel substructure fabricating begins.
  • Substructures are delivered to the project site and the deck substructure is installed.
  • Required utility (ie. water, electrical) materials are installed and the surface decking completed.
  • Systems are placed into the water and installed and anchored as per the final project plans.
  • All payments occur and the ownership and occupation is turned over to the client.

For more on the process, please click here for our Information PDF. You may also like to read our summary of Project Procedures, application to installation. We’re also happy to provide you with many needed forms and documents here.

Watch Our VIDEOS
The Big Barge Docks are the docks where the people are NOT holding onto their boats!


Click on an image to view the construction process:

Truck load of pipe

Truck load of pipe

We start with pipe, custom cut and fit

We start with pipe, custom cut and fit

Joints are welded and pressure tested

Joints are welded and pressure tested

Welded pipes give a minimum floatation of 20lbs/sq.ft.

Welded pipes give a minimum floatation of 20lbs/sq.ft.

Boat slip finger is single pipe complete with hinges

Boat slip finger is single pipe complete with hinges

All joints have hinge connection

All joints have hinge connection

Boat slip finger construction

Boat slip finger construction

Boat slip finger construction

Boat slip finger construction

Pontoon Construction

Pontoon Construction

Pontoon Construction

Pontoon Construction

Load of Pontoons

Load of Pontoons

Unloading Pontoons

Unloading Pontoons

Fabrication Docks

Fabrication Docks

Boat Slip Finger Installation

Boat Slip Finger Installation

Boat Slip Finger Installation

Boat Slip Finger Installation

Decking Steel Joists

Decking Steel Joists

Decking Steel Joists

Decking Steel Joists

Pontoon section into lake

Pontoon section into lake

We can build by your old dock to minimize downtime

We can build by your old dock to minimize downtime

Electrical wires are installed so wire exposure is minimized for safety

Electrical wires are installed so wire exposure is minimized for safety

Electrical Install

Electrical Install

Subdeck

Subdeck

In lake, ready to pin

In lake, ready to pin

Tough Dock

Tough Dock

If water access is available we can unload directly

If water access is available we can unload directly

We have removed the old piles and are getting ready to slide the new dock into place

We have removed the old piles and are getting ready to slide the new dock into place

Pier to access floating docks

Pier to access floating docks

We can transport structures to any location

We can transport structures to any location

©2012 Big Barge Docks Systems Inc. Site design by Prima Design.